中文
ENGLISH
| Available Material (metals) |
Available Material (plastic) |
| Alloy (aluminum, zinc, magnesium, titanium) |
ABS, PC,ABS, PMMA (acrylic), Delrin,POM |
| Brass, bronze, beryllium, copper |
PA (nylon), PP, PE, TPO |
| Carbon steel, stainless steel, SPCC |
Fiberglass reinforced plastics, Teflon |
| Processes |
Surface treatment (finish) |
| CNC machining(Milling/Turning), Grinding |
High polish, brush, sand blast, anodization |
| Sheet metal stamping, bending, welding, assembly |
plating (nickel, chrome),powder coat, |
| Punching, Deep drawing, Spinning |
Lacquer painting, , silk screen, pad printing |
| Equipment |
Quality control |
| CNC machining centers (FANUC, MAKINO) | CMM (3D coordinate measuring machine), 2.5D projector |
| CNC turning centers/ Lathes / Grinders | Thread gauge, hardness, caliber. A closed-loop QC system |
| Punching, Spinning and Hydraulic tensile machines |
Third party inspection available if required |
| Lead time & Packing |
Application |
| 7~15 days for sample, 15~25 days for production |
Automotive industry / Aerospace/ Telecom equipment |
| 3~5 days via express: DHL, FedEx, UPS, TNT, etc. |
Medical / Marine / Construction / Lighting system |
| Standard export carton with pallet. |
Industrial Equipment & Components, etc. |



