The top ten problems that are likely to occur in the mold testing process

Common Problems in Mold Testing 1: Sticky Molds in Main Gates
 
    Problem solving method and sequence:
 
        1 polish the main sprue → 2 nozzle and mold center coincidence → 3 reduce the mold temperature 4 shorten the injection time → 5 increase the cooling time → 6 check the nozzle heating ring → 7 polish the mold surface → 8 check the material for pollution.
 
Common problems in the test mold 2: plastic parts demolding difficulties
 
    Problem solving method and sequence:
 
        1 Reduce the injection pressure → 2 Shorten the injection time → 3 Increase the cooling time → 4 Reduce the temperature of the mold → 5 Polishing the mold surface → 6 Increase the slope of the mold release → 7 Reduce the gap at the inserts.
 
Common problems in the test mold 3: poor dimensional stability
 
    Problem solving method and sequence:
 
        1 change the barrel temperature → 2 increase the injection time → 3 increase the injection pressure → 4 change the screw back pressure → 5 increase the mold temperature → 6 reduce the mold temperature → 7 adjust the amount of material supply → 8 reduce the proportion of return material

Common Problems in Mold Testing 4: Surface Ripple
 
    Problem solving method and sequence:
 
        1 Adjust the amount of material supply → 2 Increase the mold temperature → 3 Increase the injection time → 4 Increase the injection pressure → 5 Increase the material temperature → 6 Increase the injection speed → 7 Increase the size of the sprue and gate
 
Common problems in the test mold 5: warping and deformation of plastic parts
 
    Problem solving method and sequence:
 
        1 lower the mold → 2 lower the material temperature → 3 increase the cooling time → 4 lower the injection speed → 5 lower the injection pressure → 6 increase the screw back pressure → 7 shorten the injection time
 
 
Common problems in the test mold 6: peeling and delamination of plastic parts
 
    Problem solving method and sequence:
 
        1 check the type and grade of plastic → 2 check whether the material is contaminated → 3 increase the mold temperature → 4 material drying treatment → 5 increase the temperature of the material → 6 reduce the injection speed → 7 shorten the length of the gate → 8 reduce the injection pressure → 9 change the location of the gate → 10 use a large hole nozzle
 
Common Problem 7 in mold testing: silver wire mottled sprue sticking to the mold
 
    Problem solving method and sequence:
 
        1 Reduce the material temperature → 2 Dry the material → 3 Increase the injection pressure → 4 Increase the gate size → 5 Check the type and grade of plastic → 6 Check whether the plastic is polluted or not
 
Common Problem 8: Poor surface luster in mold testing
 
    Problem solving method and sequence:
 
        1 material drying treatment → 2 check whether the material is contaminated → 3 increase the material temperature → 4 increase the injection pressure → 5 increase the temperature of the mold → 6 polish the surface of the mold → 7 increase the size of the sprue and gate
 
Common Problems in Mold Testing 9: Dents
 
    Problem solving method and sequence:
 
        1 Adjust the amount of material supply → 2 Increase the injection pressure → 3 Increase the injection time → 4 Decrease the material speed → 5 Decrease the mold temperature → 6 Increase the air vent → 7 Increase the size of sprue and gate → 8 Shorten the length of the sprue channel → 9 Change the location of the gate → 10 Decrease the injection pressure → 11 Increase the screw back pressure
 
Common Problems in Mold Testing 10: Air Bubbles
 
    Problem solving method and sequence:
 
        1 material drying treatment → 2 reduce the material temperature → 3 increase the injection pressure → 4 increase the injection time → 5 increase the mold temperature → 6 reduce the injection speed → 7 increase the screw back pressure

Contact us if you have program needs!


Previous:No
Next:Automotive stamping die in large, precision and other areas of progress is obvious, the rapid development of plastic and rubber molds

About Us

Our Service

Why Choose Us

Get a quote

Contact Us

By clicking "Accept", you agree to the storing of cookies on your device to enhance site navigation,
analyze site usage, and improve marketing. we never collect any personal data.